Alpha-N x RKP F82 M4 Carbon Trunk | RKP-F82-CFT-R-2

Read Product Details


$3,495.00

Alpha-N

Part# RKP-F82-CFT-R-2

Important Fitment Note:
Made to Order - 8 Week Lead time
Professional Installation Recommended


In Stock In Stock
Item is IN STOCK, order now and will ship out within 1 business day!
Made to Order Made to Order
This product is made to order. ETA will be provided once order is submitted to supplier.

Earn Rewards! +17475 Points


Made to Order - 8 Week Lead Time


The Alpha-N x RKP F82 M4 Carbon Fiber Trunk Lid is the product of an exclusive collaboration between Alpha-N Performance and RKP Composites. This trunk lid represents the perfect blend of Alpha-N’s expertise in high-performance production and RKP’s mastery in precision design, crafted to enhance both the appearance and functionality of the BMW F82 M4.

RKP, recognized for its ability to work seamlessly within BMW’s original body lines, brings a design that elevates the M4’s aggressive stance, while Alpha-N ensures every trunk lid is produced with the highest attention to detail. This collaboration results in a trunk that’s 60% lighter than the OEM counterpart, delivering significant weight savings without sacrificing strength or style. The trunk also integrates the BMW Performance spoiler, offering M4 enthusiasts a cohesive, one-piece design.

Key Features:    

  • Exclusive collaboration between Alpha-N Performance and RKP Composites
  • 60% lighter than the OEM trunk lid
  • Hand-laid 2x2 twill weave carbon fiber

NOTE: Alpha-N raw carbon body components are designed for OE fitment, but minimum weight with maximum strength. As such, they do not contain fiberglass, filler, or thick resin layers that, while helpful in presenting a smooth finish, add unnecessary weight and weaken component rigidity. These parts are designed for professional prep, paint, and installation. A straight clearcoat application may highlight surface imperfections.





⚠️CALIFORNIA WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov

Made to Order - 8 Week Lead time
Professional Installation Recommended

Can't find what you're looking for?
Odds are we can get it! Click Here Now